Comms Principle #4: Multi Faceted Communications

Yes, they are all different

Yes, they are all different

With the multiple forms of communication that are at our disposal these days, it is inexcusable not to engage with stakeholders to determine whether communications are being well received, or whether they are leaving gaps. The problem in many cases though is that if you have several hundred, or even thousands of stakeholders to manage, catering to such a broad range of feedback, requests or issues is going to be tough.

And this is where we begin to see the exhaustively detailed work done during the stakeholder mapping and segmentation process start to pay dividends.

A thorough understanding of who your stakeholders are, their level of influence, their background and who they interact with will provide you with a clear picture of the form or forms that your response needs to take.

Once you have all your stakeholders mapped, you need to set up properly in order to provide a streamlined approach to handling responses.  By “streamlined”, I mean considering the development of a number of potential channels and matrix structures.  So let’s take a look at how this can be achieved.

Firstly, you need to make sure that the obvious issues are well in hand.  Assuming you are a member of an experienced and knowledgable Project Team, the first steps should be self evident – development of a list of terminologies or acronyms commonly used, and a list of Frequently Asked Questions.

specialist_versus_generalistNot only will the development of these two vital communications pieces provide you with a sound platform for understanding the scope of the communications challenge, they will also help you personally to understand the detail.  Most Comms Managers are generalists, not specialists, but in order to make the best use of your time you need to develop at least a reasonable grasp of your subject matter.

Use the experts on you project team to help with this.  Initially, they will probably be quite willing to help, but may become a bit more resistant as you push them to provide you with better answers.  And don’t forget, the answers they provide will not be the end of the story – many stakeholders may not believe the answers, or believe that they are wrong, incomplete, or miss a number of issues.  Only once you have got the position recorded can you start to build a picture of where the gaps exist, but at least you can make a start on trying to get everyone onto the same page.

One other point on this.  People tend to view a new Comms Manager as someone who will communicate innately, someone capable of filling a gap while operating in a vacuum.  This, of course, is a pipe dream.  You will need their help and their expertise in order to develop messages that resonate.  As you increase your own understanding they will expect you to be able to do more on your own, but of course your greater understanding will also mean that you will notice gaps or inconsistencies more readily, and when this happens you will start to challenge the answers your peers have provided.

At this point, it is likely that you will start to experience some push back, and be told “Oh, don’t worry about that” or “That’s not really an issue”, or perhaps “You’re going into this in too much depth”.

A necessary evil

A necessary evil

Don’t EVER accept that.  It is your job not only to represent their views to the stakeholders but just as importantly to represent the views of the stakeholders to the project team.  Like an interviewer, your job is to consider both sides of the story.  Ignoring stakeholder concerns and questions because they are inconvenient is the quickest route to failure.

Playing devil’s advocate is often a tiresome activity, and one that may on occasion provoke a degree of frustration within the project team, but it is an entirely necessary process, so make a point of explaining why you’re doing it.  If the answers you get don’t convince you, they won’t convince your stakeholders either.

Next, you need to designate comms representatives and build alliances.  If you have several hundred stakeholders to manage, there is no way you can manage them all personally.  However, there will be individuals across the stakeholder landscape who are predisposed to support your project.  Nurture them.  Find out who they interact with and who they may be able to influence.  Providing them with the opportunity to feed back to you any issues that they may have or that they may have heard others have is going to improve the relevance of the communications you provide immeasurably.

Recognize the fact that in many cases the communications you provide will not come directly from you.  They may be cascaded through the organization, and in fact this cascade process may well be a part of your design.  However, communications often follow relationship or expertise pathways, rather than reporting lines.  I have known communications materials to be shared across continents by people who work in entirely different departments and roles.  Why?  Well, perhaps they used to work together.  Perhaps they met on a training course.  Maybe they have the same personal interests.  Relationships form in all kinds of ways that you may not understand.

It is therefore critical to remember that while communications can certainly cascade along hard reporting lines, they can also cascade functionally, among dotted line reports, and along completely informal interpersonal lines.  Where you are able to build relationships, find out who people are talking to, and what they are hearing.  See whether these relationships can be leveraged to become a living part of the comms process.

The materials you will provide need to resonate with each audience.  That does not mean that every comms piece has to be produced to an extreme level of functional granularity, but rather that nobody should ever directly receive a comms piece and, having read it, think to themselves “Why the hell did they think that I would have any interest in that?”.  Every piece of information that they receive directly from you must have something that is of value to them.  These are busy people.  If they are suspicious of the objectives of the project then any comms piece that they feel wastes their time is a nail in your personal comms coffin.

Don't assume your audience listens when you want it to

Don’t assume your audience will be listening when you want them to listen.

In addition to the comms channels that you select, and these will vary based on your organization, it is important to remember that most stakeholders will at best only glance at the materials you send them at the time they receive them, but will quite possibly want to return to them when they have the time or the inclination to find out more.

It is imperative to provide them with a means of accessing these materials in their own time, and making sure that they know where to go to find them.

The internet makes this possible almost without exception.  Everyone you want to interact with will have access to a database, or an intranet site, or a dropbox.  Communicate the location of this information and how it can be accessed consistently.  Make sure they know where to go.  Make sure the only versions of documents that appear in this ‘database’ are the current versions.  Make sure that the database is structured in a manner that makes the relevant information easy to locate.

There are a host of other observations that I could add on this subject, but this post is already quite long and therefore I will add only one further piece of advice.  Please, please, please make an effort to actively seek feedback that can inform the process.

thumb_surveymonkeyFacilities such as ‘Survey Monkey’ make it possible to solicit feedback from widely dispersed groups of stakeholders.  Structuring a survey correctly will allow you to see how well your comms strategy is working, and to get a feel for areas where there are issues to be overcome.

However, it is important to remember that initiating a survey is first and foremost for the purpose of improving the comms process.  Far too many people use it as a means to cover their ass, structuring the questions so as to be able to deflect criticism of the comms process and make themselves look better.

I understand the reason for this – as I believe I recall saying in my first post of this series comms usually gets little of the credit when things go right and the lion’s share of the blame when things go wrong.  However, if you are truly looking to improve the comms process then taking a dispassionate approach to surveys must be paramount.

In the next post, I’m going to be blogging about engagement with Senior Management.  I’ve seen many examples of where this critical element was mismanaged.  But I’ve also seen examples where it was done exceptionally well, and I’ll share some of these experiences in Principle #5.

 
1 Comment

Posted by on March 2, 2013 in Change Management, Communications

 

Tags: , , , , , , , , , , , , , ,

Comms Principle #3: The Importance of Dialog

Comms channels and stakeholders

Hooray – ‘Oliver’ is getting the message, so put your feet up and wait for the change program to succeed

In the first two Comms Principles of this series, I’ve talked about channel selection and stakeholder segmentation.

Now, let’s imagine that one of the key stakeholders your segmentation process has identified is a cat, ‘Oliver’, and that the channel you have selected to deliver the message is a train, a train that can be verified as one that will reach Oliver.

The message is consistent.  Delivery is always complete.  So the comms strategy must be succeeding.  Right?

Now that may seem like a rhetorical question but it’s not, and those of you that answered “no” are wrong.  On the other hand, anyone who answered “yes” (and there may be one or two) is also wrong.  The correct answer is “we have no idea”.

What do we know about ‘Oliver’.  It’s true that he’s getting the message, but what is his reaction to it?  Does he like it?  Is it annoying?  Why isn’t he moving?  In fact let’s make the question even simpler.  Has Oliver looked at it, or is he ignoring it? The answer is still “we have no idea”. Hmmmm.

Incomplete Comms Process Flow

A Comms Process Flow….sort of

OK, let’s have a look at our Comms Process flow chart – maybe that will tell us what’s going wrong.  As we can see, the Comms Manager sits within the Project Team.  Communications are developed via his interaction with other project team members.

The Comms Manager is not an IT expert.  He’s not a member of the Management Board, he doesn’t get involved in financial planning, and when it comes to Supply Chain processes, he can’t see the Forrester Effect for the trees.   Because of this, he needs access to the people who are specialists – the workstream leads; the senior user and supplier; the Project Manager.

In partnership with the workstream leads, he develops multiple pieces of communication.  He talks to the IT lead, discussing the challenges they face with the legacy systems.  He talks to Operations to learn about inventory visibility.  He talks to finance to understand what the key reporting metrics are and whether there are any that conflict across functions or business units.

With the help of all these experts, he develops a suite of communications materials – some high level and aimed at Senior Management, some in greater functional detail.  All are designed to give each stakeholder the information they need, built with the input of experts, validated across other key project streams and with the Project Manager, and delivered by channels that are proven to reach the target audience effectively.

Yet something is lacking, and if you look closely at the chart you can see why. Despite the fact that the communications pieces themselves are excellent, the process itself is flawed.

Just because you served it up doesn't mean they'll swallow it.

Just because you served it up doesn’t mean they’ll swallow it

The communications are developed within the project team as an iterative process, seeking feedback, involving experts, using their expertise, building layer upon layer.

Then a hatch is opened, the comms pieces are thrown out to the stakeholders, and the hatch closed again.

Now, if the comms materials are raw meat and the stakeholders are ravenous lions this process may work, up to a point.  But as we’ve already discussed in an earlier post, people usually don’t like change, so there’s a good chance that you will not see a feeding frenzy when you serve up a nice plate of Raw Comms.  In fact, this approach has been known to result in the lions eating the Comms Manager.

And so we return to Oliver and we think “If we asked Oliver what he thought about all this, would he have something to say?”.  We look at the process flow chart and we say to ourselves “Why are we seeking feedback within the project to increase our understanding, and yet not soliciting feedback from the stakeholders – the very people that we are supposed to be influencing? Why are the arrows only going one way?”

Engaging with Oliver would tell us whether he (a) knows what is going on and supports it completely without needing more information, (b) doesn’t know what is going on and knows he needs to understand it more, but is afraid to admit he doesn’t understand it and is therefore being stubborn, or (c) knows exactly what it means and disagrees so completely that he is stopping the message getting any further, hoping that eventually it will derail.  There are reasons (d) through (w) as well, but you get my point.

If I was asked to put money on the main reason that project communications strategies fail, this would be it. The feedback of stakeholders is not sought, not valued, not discussed or not addressed.

Some great lessons for communications

Some great lessons for communications

This shouldn’t be a surprise to anyone, but frequently it is.  A fairly senior adman that my wife worked for a few years ago used to live by the mantra that if you say something a minimum of three times people will get it. How he rose to his exalted position with such a facile view of communications is beyond me, but the main point that he fails to take into account is that ‘getting it’ is not the same as ‘believing it’.

In his book ‘The Righteous Mind – Why Good People are Divided about Politics and Religion’, psychologist Jonathan Haidt, a Professor at NYU’s Stern School for Business provides a rationale for this key difference. Expanding on observations originally made by Plato that human beings weigh evidence in the search for knowledge, Haidt says that we are hardwired to make snap judgements based on our emotions, and then we manipulate the manner in which we process facts in order to justify the largely emotional conclusions that we had already reached.

Ah, you may say, but the people we are seeking to influence are experts in their respective fields.  They are the ones whose experience needs to be leveraged in order for the change to be successful.  This being the case, surely these are the very people that will weigh the evidence to arrive at “knowledge”?

Well, no, or at least not as far as I have observed in my career.  While it is possible that these people are experts, let’s not forget the other ingredients that make successful communications such a difficult recipe, some of which I discussed in Principle #2 – reasons which in many cases are significantly more personal in nature than they are professional:

  • Despite the fact that they are experts, they are first and foremost human
  • Their personal career objectives may not align with your corporate ones
  • There are usually several ways to skin a cat (sorry Oliver) and they may think that the efficiency of their way outweighs the effectiveness of yours
  • They may already have too much to do, and you’re asking them to relearn it
  • The change that you are proposing may make their current role redundant, or require a change in reporting or remuneration with which they are extremely uncomfortable

Of course there are other potential reasons as well, but while not one of the reasons above could be said to disprove any of the theory, invalidate any of the process changes or discredit the new IT solution or organization structure that you are intending to build, any one of them is a very good reason for a stakeholder to not support the change.  They are selfish reasons to be sure, but that fact does not make them any less real, or valid, and as a Comms Manager it is your role to find out what the reasons for the lack of engagement are, and to see what can be done to address them.

Without engaging with your stakeholders, it is unlikely that you will be able to combat these issues.  Certainly there may be ways in which you can address some of them by talking about best practice, pointing to improvements made by other companies or organizations, or talking about changes in the marketplace, but these are somewhat sterile responses and don’t go very far towards addressing what may be intensely personal concerns.  Your stakeholders know that they are personal issues, and may therefore be reluctant to discuss them openly.  And of course if one of your stakeholders feels this way there may be others.

Find a way to discuss the facts, not the conjecture

Find a way to discuss the facts, not the conjecture

To engage with them, you have to make them truly believe that you value their feedback, that you want to hear their concerns or suggestions.  They must have the means to review the documentation as and when they have time, and have a number of clear channels via which issues can be raised.

If you don’t give them the opportunity to air their opinions with you, and thereby have the opportunity to address them, you will usually find that they share them with their colleagues, but that they do so in a manner that undermines the change program, starts rumors and leads to a much greater volume of negative feeling.

So how do you engage with literally hundreds of stakeholders?  I’ll be offering some suggestions in Comms Principle #4 – A Multi-Faceted approach.

 
 

Tags: , , , , , , , , , , , , , , ,

Comms Principle #2: It’s Stakeholder, not Steakholder

Melanie Griffith in 'Working Girl'. Photo: 20th Century Fox

Melanie Griffith in ‘Working Girl’. Photo: 20th Century Fox

In the 1988 movie ‘Working Girl’, Alec Baldwin delivers an ultimatum to Melanie Griffith, to which he receives the response “I am not steak – you can’t just order me.”

I’m sure the line was never meant to be relevant to corporate communications, but I’ve never found one that better sums up the manner in which some communications strategies rely on beating their audience into submission.

In the past (and I mean the long distant past), leadership styles were significantly more authoritarian than they are today.  Raising issues with management direction could have been a career decision.  And in some companies this can still be the case, although thankfully it is now the exception rather than the rule.

Today’s Management Boards have recognized that simply mandating a change does not ensure its successful delivery.  While everyone may pay lip-service to the objective the fact remains that people are, in general, very resistant to change.

Daniel Burrus

Daniel Burrus – Collaboration vs. Cooperation

When proposing a program of strategic change, one of the first things that needs to be appreciated is the fact that dragging people towards an objective is not nearly as effective as having them gravitate towards it.

One of my favorite bloggers, Daniel Burrus, wrote an interesting piece on LinkedIn a few weeks ago that clearly articulated the difference between collaboration and cooperation, and pointed out that people confuse the two. The key distinction he makes is worth repeating here:

“Cooperation is based on a scarcity mindset; it’s about protecting and defending your piece of the pie.  Collaboration is based on an abundance mindset, working together to create a bigger pie for all”.

Change means uncertainty - people don't like uncertainty

Change means uncertainty –
and people don’t like uncertainty

Seems obvious, doesn’t it?  But where Change Management activities are concerned, it’s one of those key distinctions that tend to fall by the wayside in the headlong rush to build consensus and move forward. The problem of course is that if you settle merely for stakeholder cooperation, everything you build thereafter will be less stable and the consensus is liable to develop cracks.  If you want to build on a solid foundation, you need your stakeholders to want what you want.  In order to do this they have to share your vision, not just execute it.

And that, when all is said and done, is the tough bit.  How do you get a group of stakeholders not just to move in the same direction, but to want to move in the same direction and to encourage others to come with them?

Your new strategic direction may promise inescapable benefits for the organization, but it may also have a dramatic impact of a vast number of careers.  It may require employees to learn new skills, or new ways of working.  It may require changes in their reporting lines or the manner in which they are remunerated.  Suppliers or customers may be required to work with you in new ways (which can be tricky to enforce with suppliers, and next to impossible with customers).  It may also mean that some existing roles become redundant, in which case having your stakeholders believe that as one door closes several others will open is of critical importance.

There will undoubtedly be personal issues that shape the opinions of stakeholders both inside and outside your organization, and you will need to understand them (something I’ll come back to in a future post), but your first priority should be to understand where everyone fits, both in terms of how they can impact the project and how they are impacted by it.  This is the essence of Stakeholder Segmentation.

A typical stakeholder map for an internal change program

A typical stakeholder map for an internal change program

A large group of stakeholders can be segmented in a number of ways, but the key requirements are to understand where they fit in terms of reporting and role, to understand their level of seniority or influence, and to understand the likely impact of the project on their day job or, for external stakeholders, their business.

Getting the names of all these stakeholders, their responsibilities and other key information is not a difficult task, but it is time consuming and unfortunately there is no way around it.

Existing org charts will take you some of the way there, as will mailing lists, but the remainder will largely be grunt work – talking to colleagues, making phone calls, sharing iterations of the list and seeking feedback until such time as you can be sure it is broadly complete. There will always be one or two that you miss, but they will become apparent as soon as the comms flow starts.

With the list in place, you can start to determine what kind of communications detail will be required for each audience.  Your IT stakeholders will likely require very different information that that required by your marketers, or by HR, or your suppliers, and while you may be able to use some of the communications materials across all stakeholder groups, each group should feel that the materials you develop have something in it for them.  Remember, the more information that does not apply specifically to a particular stakeholder, the less likely that stakeholder is to read it.  Management may have mandated the change, but getting the stakeholders to pay attention, understand and actively engage will be on you.

Prince2 Project Management structure

Prince2 Project Management structure

If you need to go to the length of producing modular communications material, which is entirely possible, you will need to start building relationships with the experts in your project team and project board.

The Project Manager is always a good place to start, and he/she will be able to describe the skill sets available to help you develop the detail that the communication may require.  In addition, your project’s Senior User or Senior Supplier will be able to help you be aware of some of the key challenges that exist, both in terms of the benefits that are expected and the challenges of implementation. I should probably point out here that I am using Prince2 project management structure, since that is what I was trained in, but other Project Management methodologies encompass similar roles.

This will be the point at which some sensitivities exist, as you will also have to segment your stakeholders based on perceived level of support and influence.  Those who support the activity may be able to become active in influencing others, but you will need their support to be on message because not only do you want them to communicate correctly and not start any unnecessary rumors in motion, but also you want them to bring you feedback so that any level of resistance apparent in initial discussions can be addressed while it is still just a risk, rather than waiting until it becomes an issue.

There will invariably be certain key stakeholders who are skeptical or hostile.  It is particularly important to highlight who they are at an early stage, particularly if they have a level of seniority that could delay or undermine the project, or if they have expertise that is held in high regard by other stakeholders.  A bit of extra time or effort spent on syndicating objectives with this group of individuals, and sounding them out for objections or concerns will pay dividends in the long term.

Assign responsibilities for covering key stakeholders

Assign responsibilities for covering key stakeholders

In order to be certain of their views and to encourage their positive engagement, you may need to use “man defense” rather than relying on “zone defense”, meaning they will need to be approached on an individual basis, ideally by someone within or close to the project, and with whom they have a good relationship.

This ‘relationship owner’ takes responsibility for representing the details correctly, engaging frequently to secure feedback, and reporting the substance of any resistance back to the center.

This is unfortunately quite a labor intensive way of engaging (to ensure just one individual is in possession of all the facts, and that his or her opinions are accurately recorded), but in a small number of cases you may find there is no substitute for it, and even that it can be more efficient.

Finally, while it is important to know what your stakeholders think, it is just as important that they know you know and that they have confidence that their concerns are being taken seriously.

There is only one thing worse than being confronted with a change you don’t agree with, or not knowing who to talk to and how to raise concerns, and that is to talk to someone and raise concerns and never hear anything about it again.  If this happens, you’ve taken a key step towards getting your stakeholders engaged and then dropped the ball by not letting them know that you’ve heard their concerns, that you’ve shared them with the relevant people and that an answer is being developed.  In short, you’ve given the impression that their views are irrelevant.

If you don’t have an answer, don’t bullshit them.  They will almost certainly find out and when they do you will have gone 90% of the way towards losing their trust forever.  Tell them you don’t know, then go and find out what the answer is.  Unless you’re dealing with a stakeholder who has a particularly poisonous agenda (and they do exist), you will gain points for honesty and collaboration far more often than you will lose them for being “unprepared”.

Is this all there is to stakeholder management?  Of course not but this is a blog not a book, and following these basic steps will at very least move you in the right direction.

I’ll cover more on the subject of establishing a dialogue with your stakeholders in Comms Principle #3.

 
2 Comments

Posted by on January 15, 2013 in Change Management, Communications

 